Government contracting guide
Davis-Bacon Certified Payrolls: The 7-Day Delivery Clock, the Mailing Alternative When No Agency Representative Is On Site, and the 3-Year Records That Survive a WHD Request


Direct answer
For covered Davis-Bacon and Related Acts work, contractors and subcontractors submit a certified payroll for each week in which covered work is performed. Under 29 CFR 3.4(a), the payroll must be delivered within 7 days after the regular payment date of that payroll period. If no agency representative is at the worksite, the rule permits delivery by mail or another means normally assuring delivery within that same period. No specific postal service is required.
Contractors and subcontractors preserve payroll records and certified payrolls for 3 years after all work on the prime contract is completed. The prime contractor is responsible for submitting all subcontractors' certified payrolls.
Requirements at a glance
| Requirement | Applicability | Timing | Delivery method | Exceptions or qualifications | Controlling authority |
|---|---|---|---|---|---|
| Weekly certified payroll | Each covered contractor and subcontractor performing DBA- or Related Acts-covered work | Weekly for each week covered work is performed | To the federal agency if it is a party to the contract. Otherwise, to the applicant, sponsor, owner, or other recordkeeping entity for transmission to the agency | Part 3 certified-payroll requirements do not apply to contracts of $2,000 or less. Contract and program procedures determine the submission route | 29 CFR 3.3(b)–(c); 29 CFR 5.5(a)(3)(ii)(A) |
| Seven-day delivery clock | Certified payrolls required under 29 CFR 3.3 | Within 7 days after the payroll period's regular payment date | To an agency representative at the site. If none is present, by mail or another means normally assuring delivery within the 7-day period | The rule does not require Certified Mail | 29 CFR 3.4(a) |
| Payroll transmittal and certification | Each weekly submission | With each certified payroll | WH-347 or another format containing the required information and Statement of Compliance | Do not include full SSNs or workers' last known addresses, telephone numbers, or email addresses in weekly transmittals | 29 CFR 5.5(a)(3)(ii)(B)–(E) |
| Record retention and production | Contractors and subcontractors; reviewed certified payrolls are also retained by the agency | 3 years after all work on the prime contract is completed | Make records available for authorized inspection, copying, and transcription | WHD may set a production deadline. Failure to meet it can prevent the records from being introduced in a 29 CFR part 6 administrative proceeding | 29 CFR 3.4(a)–(b); 29 CFR 5.5(a)(3)(i), (ii)(G), (iv) |
The weekly obligation and the seven-day clock
The weekly submission requirement and the delivery deadline use different reference points. Under 29 CFR 5.5(a)(3)(ii)(A), a certified payroll is submitted for each week in which covered work is performed. Under 29 CFR 3.4(a), delivery is due within 7 days after the regular payment date for that payroll period. The deadline does not run simply from the end of the workweek.
The submission route also needs to be established before work begins. If the federal agency is a party to the contract, the payroll goes to that agency. If it is not, the contractor submits it to the applicant, sponsor, owner, or other entity maintaining records for transmission to the agency. The prime contractor is responsible for submitting all certified payrolls from all subcontractors.
A subcontractor's transmission to the prime is therefore not, by itself, proof that the required agency submission was completed. The prime's control should track the subcontractor's payroll through final transmission and retain evidence of the relevant delivery event.

The mailing alternative when no agency representative is on site
Under 29 CFR 3.4(a), when no representative of the contracting or financing agency is at the site, the certified payroll may be delivered by mail or by any other means normally assuring delivery to the agency within the 7-day period. The rule does not name Certified Mail or require a particular postal product.
The operational issue is whether the chosen method normally assures delivery within the deadline and whether the contractor can document what happened. Keep a dated transmission record, the destination, the method, and confirmation of delivery or other receipt evidence. A mailing receipt can document mailing; it does not, by itself, establish that the agency received the payroll within the required period. See the related guide to proof of mailing and proof of notice.
Payroll content, privacy, and signatures
Weekly transmittals must include the required payroll information and a signed Statement of Compliance. That statement certifies that the payroll and supporting records are correct and complete; covered workers received full weekly wages without rebate or impermissible deductions; and workers received at least the applicable wage determination rates and fringe benefits for the classifications actually performed.
A contractor, subcontractor, or the agent who pays or supervises payment may sign the Statement of Compliance. The signature must be an original handwritten signature or a legally valid electronic signature. Optional Form WH-347 is permitted, but another format may be used if it contains the required information and certification.
Weekly transmittals must not include full Social Security numbers or workers' last known addresses, telephone numbers, or email addresses. Use an individually identifying number, such as the last four digits of an SSN. The full information remains part of the basic records and must be maintained and produced upon request under 29 CFR 5.5(a)(3)(iv)(C).
Electronic submission is permitted or required only where the system requires a legally valid electronic signature, allows the contractor, agency, and DOL to access certified payrolls upon request for at least 3 years after prime-contract completion, and allows other submission methods when the contractor is unable or limited in using or accessing the system.
The three-year records file
Contractors and subcontractors must retain regular payroll records for 3 years after all work on the prime contract is completed. Those records must accurately document each worker's name, SSN, last known address, telephone number, and email address; correct classification or classifications; hourly wages and fringe-benefit contribution rates or anticipated costs; daily and weekly hours worked in total and on each covered contract; deductions; and actual wages paid.
Certified payrolls have a separate, parallel retention requirement: preserve them during the work and for 3 years after completion of all work on the prime contract. After review, the agency preserves its certified payrolls for the same period and produces them for DOL inspection, copying, or transcription upon request.

Records requests and the evidence trap
A request from the Wage and Hour Division (WHD) creates a production deadline, not just a preservation obligation. Under 29 CFR 5.5(a)(3)(iv)(B), a contractor or other person that fails to provide required records to WHD within the requested time is precluded from introducing those records as evidence in an administrative proceeding under 29 CFR part 6. WHD considers reasonable extension requests and may take the records' location and production volume into account.
Failure to submit records, make them available, or permit worker interviews can also lead the federal agency, after written notice, to suspend further payment, advance, or guarantee of funds. The failure may be grounds for debarment under 29 CFR 5.12.
The payment consequences extend beyond record production. Under 29 CFR 5.5(a)(2)(i), accrued payments or advances may be withheld to satisfy wage and monetary-relief liabilities, on the agency's own action or on DOL's written request. After written notice, payments may be suspended for failure to pay wages or submit records. The Department has priority to withheld funds over claims by sureties, reprocurement, bankruptcy trustees or estates, assignees, successors, and Prompt Payment Act claimants.
The contract also requires posting the applicable wage determination and Davis-Bacon poster WH-1321 at all times in a prominent, accessible place at the worksite. Interest is payable on wage underpayments under 29 CFR 5.5(a)(1)(vi). Falsifying required certifications may result in civil or criminal prosecution under 18 U.S.C. 1001 and 31 U.S.C. 3729.
Practical implementation and evidence-file checklist
The following controls support timely submissions and organized production. They are operational practices, not additional regulatory requirements.
- Weekly submission log: Record each subcontractor, payroll period, regular payment date, calculated 7-day deadline, submission recipient, transmission date, method, and status.
- Delivery evidence: Save the transmission confirmation or other delivery record with the submitted payroll. Link each record to the payroll period and recipient.
- Certification file: Retain the WH-347 or alternate Statement of Compliance, identify the signer and authority, and distinguish handwritten from legally valid electronic signatures.
- Privacy check: Confirm that weekly transmittals omit full SSNs and last known contact details, while basic records retain the required information under access controls.
- Production-request log: Record the requesting authority, date received, requested records, response deadline, assigned owner, production date, and any extension request and decision.
- Posting verification: Record when and where the wage determination and WH-1321 were posted, with dated verification retained in the project file.
- Subcontractor reconciliation: Compare the subcontractor roster against received payrolls each week. Escalate missing submissions before the delivery deadline expires.
- Retention closeout: Capture the prime-contract completion date and apply the three-year retention period to regular payroll records and certified payrolls.
A single evidence trail should connect each workweek to the payroll, certification, transmission, delivery proof, and any follow-up. The audit-trail framework for legal notices and notice record retention guide provide related record-control guidance. For broader federal contracting notice topics, see the government contracting notices hub.
Frequently asked questions
Direct answer
For covered Davis-Bacon and Related Acts work, contractors and subcontractors submit a certified payroll for each week in which covered work is performed. Under 29 CFR 3.4(a), the payroll must be delivered within 7 days after the regular payment date of that payroll period.
Requirements at a glance
RequirementApplicabilityTimingDelivery methodExceptions or qualificationsControlling authorityWeekly certified payrollEach covered contractor and subcontractor performing DBA- or Related Acts-covered workWeekly for each week covered work is performedTo the federal agency if it is a party to the contract. Otherwise, to the applicant, sponsor, owner, or other recordkeeping entity for transmission to the agencyPart 3 certified-payroll requirements do not apply to contracts of $2,000 or less.
The weekly obligation and the seven-day clock
The weekly submission requirement and the delivery deadline use different reference points. Under 29 CFR 5.5(a)(3)(ii)(A), a certified payroll is submitted for each week in which covered work is performed.
The mailing alternative when no agency representative is on site
Under 29 CFR 3.4(a), when no representative of the contracting or financing agency is at the site, the certified payroll may be delivered by mail or by any other means normally assuring delivery to the agency within the 7-day period. The rule does not name Certified Mail or require a particular postal product.The operational issue is whether the chosen method normally assures delivery within the deadline and whether the contractor can document what happened.
Payroll content, privacy, and signatures
Weekly transmittals must include the required payroll information and a signed Statement of Compliance. That statement certifies that the payroll and supporting records are correct and complete; covered workers received full weekly wages without rebate or impermissible deductions; and workers received at least the applicable wage determination rates and fringe benefits for the classifications actually performed.A contractor, subcontractor, or the agent who pays or supervises payment may sign the Statement of Compliance.
Sources
- 29 CFR 3.3, Certified payrolls
- 29 CFR 3.4, Submission of certified payroll and preservation and inspection of weekly payroll records
- 29 CFR 3.5, Payroll deductions permissible without application to or approval of the Secretary of Labor
- 29 CFR 5.5, Contract provisions and related matters
- 29 CFR 5.8, Liquidated damages under the Contract Work Hours and Safety Standards Act
- Updating the Davis-Bacon and Related Acts Regulations, 88 FR 57526 (Aug. 23, 2023)
This article provides general compliance information, not legal advice.